The restoration of the building began in February 2018 and was completed within five months. The intervention allowed a
recovery of the facades, covered in marble, which presented areas in the process of detachment with portions of poor adhesion.
Each stone element has been subjected to a prior verification by “beating” followed by the operation of grouting and fixing to the surface of the building, using state-of-the-art restoration techniques.